Work is continuing on both the tower and the hospitality unit.
The picture of the tower shows the depth of the stone which SK Conservation are drilling through to repair the tower.
The hospitality building has now been plastered inside and a coat of paint added. The flooring is now due to go down and the cladding on the outside has been started.