Work has continued on the hospitality building, with the two windows now installed and partition between the kitchen and toilet erected.

Jill has been sent some pictures of the gargoyles on the top of the tower – the first of Christ the King (we believe!) on the west face of the tower and a ram’s head on the south face.  We can’t usually get close enough to get these pictures so thanks to the contractors for sending them.  The repointing is going well.  Some areas are in a worse condition than first thought and some are better.